What is an independent supervising needed for?
To get a truthful overview of contractors work
To start oil production on time
To reduce downtime and complete production stops
To minimize accidents and injuries and apply environmental standards for production
How does it work?
Quality control of contractors' work at all stages
Organization of a system for identifying and recording violations in the process of work
Act as your representative with contractors
Interaction with contractors and the customer to eliminate violations and prevent them
Action plan
Works with applying CT
  • Preparatory activities
    • inspection of equipment, presses, and reagents
    • control of the preparation of the high viscosity pill and the
  • Monitoring of compliance in
    • labor protection and environment
    • industrial safety and fire protection
    • permitting and qualification documentation
  • Control of CT operation process
    • CT operation
    • nitrogen feed and used volumes
    • viscous packs pumping intervals and volumes for
    • depth and speed of coiled tube running-up/down
Repair and insulation works
  • Preparatory measures
    • validation of the approved work plan
    • presence testing for laboratory plugging material tests
    • well definition control
  • Rule Enforcement Control
    • HSE and ES
    • industrial and fire safety
    • permitting and qualification documentation
  • Repair and insulation works control
    • progress of work, decision-making in emergency situations
    • prevention of accidents
Bottomhole
treatment
  • Preparatory activities
    • audit of an approved working plan
    • presence testing for laboratory plugging material tests
    • checking of reagents
    • control of BHT placement, the formation of PIT equipment
    • intake rate control
  • Rule Enforcement Control
    • HSE and ES
    • industrial safety and fire protection
    • permitting and qualification documentation
  • Control of BHT process
    • continuous control for the process
    • acid concentrations checking and injection volumes
    • control of liquids disposal and acidic materials
Well killing
  • Preparatory activities
    • approved working plan
    • well-killing fluid sufficiency
    • high-voltage power line and liquid intake line consistency
    • control of a well parameters and a work plan implementation
  • Rule Enforcement Control
    • HSE and ES
    • industrial safety and fire protection
    • permitting and qualification documentation
  • Well killing process control
    • instrumentation and adjustment-calibration control
    • continuous control for the well killing process
Additional advantages
Author's method
of auditing and
defining the results
Continuous
work with
contractors
Participation of COMTEK specialists in meetings with contractor representatives, consultations, and feedback
Access to all information on the project 24/7 in the customer's Personal Area