What is an independent supervising needed for?
How does it work?
Action plan
Checking the customer's production support base
- Availability and condition of the equipment
- Necessary documents
Preparing for running-in
- General readiness checking
- Checking of imported equipment
Installation of the extension pipe in place
- Additional equipment checking
- Photo snapshot
- Control the assembly sequence of shank elements
Extension pipe’s running-in
- Spinning and tooling control
- Control of process launching
- Top-up and flushing control
Extension pipe’s activation
- Сement casing head’s performance monitoring
- Checking the installation of the filter in the downstream line
- Pressure control for washing and activation
- Control of the transport column’s disconnecting
Cementing
- Сement casing head’s checking
- Analysis of grouting fluid
- Oil injection and pipe driving checking
- Pressure and circulation control
Additional advantages
Author's method
of auditing and defining
the results
of auditing and defining
the results
Continuous
work
with contractors
work
with contractors
Participation of COMTEK specialists in meetings with contractor representatives, consultations, and feedback
Access to all information on the project 24/7 in the customer's Personal Area